IEC 61850

In the following article we are going to delve into the topic of IEC 61850, which has generated great interest and debate in recent times. From its origins to its relevance today, IEC 61850 has been the subject of study and analysis by different specialists in the field, who have contributed different perspectives and approaches to this topic. Through this article, we will explore the different facets of IEC 61850, from its practical implications to its impact on society. Additionally, we will examine its evolution over time and analyze the current trends surrounding it. Without a doubt, IEC 61850 is a fascinating topic that deserves to be addressed exhaustively and critically, so we invite you to enter this exciting world and discover everything behind IEC 61850.

IEC 61850 is an international standard defining communication protocols for intelligent electronic devices at electrical substations. It is a part of the International Electrotechnical Commission's (IEC) Technical Committee 57 reference architecture for electric power systems.[1] The abstract data models defined in IEC 61850 can be mapped to a number of protocols. Current mappings in the standard are to Manufacturing Message Specification (MMS), GOOSE (Generic Object Oriented System Event) , SV (Sampled Values) or SMV (Sampled Measure Values),[3] and so on[when?] to web services. In the previous version of the standard, GOOSE stood for "Generic Object Oriented Substation Event",[4][5] but this old definition is still very common in IEC 61850 documentation.[6] These protocols can run over TCP/IP networks or substation LANs using high speed switched Ethernet to obtain the necessary response times below four milliseconds for protective relaying.[citation needed]

Features

IEC 61850 features include:

  1. Data modelling – Primary process objects as well as protection and control functionality in the substation is modelled into different standard logical nodes which can be grouped under different logical devices. There are logical nodes for data/functions related to the logical device (LLN0) and physical device (LPHD).
  2. Reporting schemes – There are various reporting schemes (BRCB & URCB) for reporting data from server through a server-client relationship which can be triggered based on pre-defined trigger conditions.
  3. Fast transfer of eventsGeneric Substation Events (GSE) are defined for fast transfer of event data for a peer-to-peer communication mode. This is again subdivided into GOOSE & GSSE.
  4. Setting groups – The setting group control Blocks (SGCB) are defined to handle the setting groups so that user can switch to any active group according to the requirement.
  5. Sampled data transfer – Schemes are also defined to handle transfer of sampled values using Sampled Value Control blocks (SVCB)
  6. Commands – Various command types are also supported by IEC 61850 which include direct & select before operate (SBO) commands with normal and enhanced securities.
  7. Data storageSubstation Configuration Language (SCL) is defined for complete storage of configured data of the substation in a specific format.

See also

  • Conformance testing – Type of testing for standards, contracts and regulations
  • DNP3 – Computer network protocol
  • IEC 60870-5-104 – Telecontrol standard
  • IEC/IEEE 61850-9-3 – International standard for time synchronisation
  • IEC 61968 – Series of communication protocol standards
  • IEC 61970 – A standard which deals with the application program interfaces for energy management systems (EMS)
  • Precision Time Protocol – Network time synchronization protocol

References

  1. ^ "IEC 61850:2021 SER". WebStore.IEC.ch. Retrieved 10 November 2021.
  2. ^ "IEC TS 61850-2:2019". WebStore.IEC.ch. Retrieved 10 November 2021.
  3. ^ "IEC 61850-9-2:2011+AMD1:2020 CSV". WebStore.IEC.ch. Retrieved 10 November 2021.
  4. ^ "IEC TS 61850-2:2003". WebStore.IEC.ch. Retrieved 10 November 2021.
  5. ^ "IEC 61850-8-1:2011". WebStore.IEC.ch. Retrieved 10 November 2021.
  6. ^ "IEC 61850-8-1:2011+AMD1:2020 CSV". WebStore.IEC.ch. Retrieved 10 November 2021.