In today's world, TGC-1 is a topic of growing interest in various areas and sectors. With the advancement of technology and globalization, TGC-1 has become a convergence point for discussion and analysis. Its impact extends to different areas, from economics and politics, to society and culture. In this article, we will explore the topic of TGC-1 in depth, analyzing its implications and repercussions in various contexts. From its emergence to the present, TGC-1 has proven to be a determining factor in decision-making and in shaping the world in which we live.
This article needs additional citations for verification. (July 2010) |
![]() | |
Native name | ТГК-1 |
---|---|
Company type | Public (PJSC) |
MCX: TGKA | |
Industry | Power generation |
Predecessor | Lenenergo Kolenergo Karelenergogeneratsiya |
Founded | 25/03/2005 |
Founder | RAO UES |
Headquarters | Nevsky branch: Saint Petersburg Karelsky branch: Petrozavodsk (Republic of Karelia) Kolsky branch: Murmashi (Murmansk Oblast), , Russia |
Area served | St. Petersburg, Leningrad Oblast, Murmansk Oblast, Republic of Karelia |
Key people | Vadim Vederchik (CEO) |
Products | electric power and heat |
Revenue | $1.23 billion[1] (2020) |
$15 million[1] (2020) | |
$114 million[1] (2020) | |
Total assets | $2.65 billion[1] (2020) |
Total equity | $1.93 billion[1] (2020) |
Parent | Gazprom Energoholding |
Website | www.tgc1.ru |
TGC-1 (also referred as TGK-1; full name: Territorial generating company number 1; Russian: ТГК-1, Territorial’naya generiruyushchaya kompaniya No 1; traded as MCX: TGKA) is a regional power company operating in North-West Russia. The company has its headquarters in Saint Petersburg with branches in Karelia and Kola.
The company was created in 2005 by the merger of Lenenergo, Kolenergo and Karelenergogeneratsiya power companies. Formation of the new company was announced on 1 March 2005 by Lenenergo, Kolenergo and RAO UES.[2] The company was officially registered on 25 March 2005 and began to operate on 1 October 2005. The integration of predecessor companies was completed on 1 November 2006. The majority shareholder of this time was RAO UES.
The company operates 52 thermal, hydro and co-generation stations in Saint Petersburg, Leningrad Oblast, Murmansk Oblast and Karelia. It has an installed generation capacity of 6,92 GW of electric power. In addition, TGC-1 is the major supplier of district heating in Saint Petersburg, Petrozavodsk, Murmansk, Apatity and Kirovsk with 13,49 thous GCal/hr of heating capacity.
The company operates through three branches – Nevsky, Karelsky and Kolsky. TGC-1 includes the following subsidiaries: JSC Murmanskaya CHPP (power supply of Murmansk and surrounding areas, share in authorised capital — 98.85%), JSC St. Petersburg Heating Grid (connection of heating networks in the area of operation of the Company's CHPPs, share in authorised capital of 65.58%), as well as dependent companies of JSC HHC (transfer of heat energy from the Apatitskaya CHPP to consumers in the city of Kirovsk, with a share in authorised capital of 50%) and TGC-Service LLC (specialised repair company, share in authorised capital - 26%).
The company's main shareholder is Gazprom through its power generation holding Gazprom Energoholding, which owns 51.79% of shares. Finnish Fortum owns 29.45% of shares.[3] The company shares are traded at the Russian Trading System and the Moscow Interbank Currency Exchange.