In today's world, Dalmatia Tower is an issue that has captured the attention of society at large. With an impact that transcends borders and covers different areas, Dalmatia Tower has become a central topic of discussion and debate. Whether due to its influence on popular culture, its relevance in the business field, or its impact on daily life, Dalmatia Tower has managed to position itself as a fundamental piece in contemporary discourse. In this article, we will explore the various dimensions of Dalmatia Tower, analyzing its importance, implications, and future in a world that continues to evolve at a rapid pace.
Dalmatia Tower | |
---|---|
![]() Dalmatia Tower completed in 2023. | |
![]() | |
General information | |
Status | Completed |
Type | Mixed-use: office, hotel |
Architectural style | Neo-futurism |
Location | Split, Croatia |
Coordinates | 43°31′13″N 16°27′04″E / 43.52028°N 16.45111°E |
Construction started | 2015 |
Completed | 2023 |
Cost | €80 million |
Height | |
Antenna spire | 135 m (443 ft) |
Roof | 112 m (367 ft) |
Technical details | |
Floor count | 27 |
Lifts/elevators | 8 |
Design and construction | |
Architect(s) | Otto Barić |
Developer | Westgate Group |
Main contractor | Tehnika d.d. |
Website | |
slobodnadalmacija |
Dalmatia Tower is a high-rise office building and a hotel in Split, Croatia. It is located on the intersection of the Domovinskog rata Street and the Dubrovačka Street and it is the tallest building in Croatia.[1]
Dalmatia Tower is ranked 1st by height in Croatia. It is 112 meters (367 feet) tall, and has 27 floors. There is a 22 meter tall steel mast on the roof, which increases the height of the tower to 135 meters (443 feet). There are five underground levels, used for parking spaces. The building is served by eight elevators. Four elevators serve floors 3 to 15 where the office space is located and the remaining four elevators serve floors 1, 2 and 16 to 27. This space is occupied by AC Hotels by Marriott hotel, with the restaurant occupying the first floor, the congress centre occupying the second floor, spa, pool and fitness occupying the 16th floor and the rest being used by the hotel rooms.[2]
The building is a part of the Westgate Towers complex, which includes two skyscrapers. First one to be built was a 12-story, 55 meters tall, Westgate Tower A, housing the headquarters of Splitska Banka, which started construction in mid 2015 and opened in late 2016.[3] Second tower was initially called Westgate Tower B, and its initial floor count was 17 with a height of 75 meters. Construction started in late 2016, however, upon reaching the 17th floor the work was halted for six months until the developer acquired the new building permit allowing the erection of additional 10 floors, now totaling 27. The work on the tower resumed in mid 2018.[4] In late 2017 Westgate project received an International Property Award for the best office high-rise in Europe.[5] Construction was completed in 2023.