Today, Bell 214 is a topic of great relevance and interest in various areas of society. Whether in the scientific, social, cultural or technological fields, Bell 214 has captured the attention of experts and fans alike. The impact Bell 214 has on our lives is undeniable, and its study and understanding becomes increasingly relevant in a constantly evolving world. In this article, we will explore different aspects related to Bell 214, analyzing its importance, its implications and its relevance in the current context. Whether we are talking about a person, a concept, a crucial date or a phenomenon of nature, Bell 214 is a topic that deserves to be explored in depth to understand its true scope.
Bell 214 | |
---|---|
![]() A Bell 214B | |
General information | |
Type | Medium-lift helicopter |
National origin | United States |
Manufacturer | Bell Helicopter |
Status | Production completed |
Primary user | Islamic Republic of Iran Army |
History | |
Manufactured | 1970–1981 |
Introduction date | 1972 |
First flight | 1970 |
Developed from | Bell 204/205 |
Developed into | Bell 214ST |
The Bell 214 is a medium-lift helicopter derived from Bell Helicopter's ubiquitous UH-1 Huey series. The Bell 214ST shares the same model number, but is a larger, much-modified twin-engine derivative.
The original development of the Model 214 was announced by Bell in 1970 under the name "Huey Plus". The first prototype was based on a Bell 205 airframe equipped with a Lycoming T53-L-702 engine of 1,900 shp.[1]
The first Bell 214A demonstration prototype followed and was evaluated in Iran during field exercises with the Imperial Iranian Armed Forces. The trial was judged successful and an order for 287 214A helicopters followed. The intention was that these aircraft would be constructed by Bell in their Dallas-Fort Worth facility and that a further 50 214As and 350 Bell 214ST helicopters would then be built in Iran. In the event, 296 214A and 39 214C variants were delivered, before the Iranian Revolution in 1979 ended the plans for Iranian production.[2]
Similar in size and appearance to the Bell 205 and Bell 212, the Bell 214 uses a single, more powerful Lycoming LTC4B-8 engine (2,930 shp; 2,185 kW) and upgraded rotor system, giving it a high lifting capacity and good performance at high temperatures and high altitudes.[3] It can be identified by the single large exhaust duct and wide chord rotor blades without stabilizer bars.
Bell offered the Bell 214B "BigLifter" for civil use.[3] It received certification in 1976. The 214B was produced until 1981. Powered by a 2,930 shp (2,183 kW) Lycoming T5508D turboshaft, it has the same rotor drive and transmission system as the 214A. The transmission is rated at 2,050 shp (1,528 kW) for take-off, with a maximum continuous power rating of 1,850 shp (1,379 kW). The BigLifter features advanced rotor hub with elastomeric bearings; an automatic flight control system with stability augmentation; and commercial avionics.[4]
As of January 2012, 29 Bell 214s were in military service, including 25 Bell 214As with Iran, and three 214Bs with United Arab Emirates.[5]
Approximately 41 Bell 214Bs are in commercial service. User countries are Australia (6),[6] Canada (10),[7] Singapore (3) and United States (15).[8]
Data from The International Directory of Civil Aircraft[19]
General characteristics
Performance
Related development