In this article, we will delve into the fascinating world of Ascent MKE, exploring its various facets, meanings and possible impacts on different aspects of life. Ascent MKE has been the object of interest and debate over time, arousing curiosity and reflections in different areas, from science to popular culture. Throughout this reading, we will analyze its relevance in the current context, as well as its influence on the development of ideas and perspectives. It doesn't matter if you are an amateur or an expert on the subject, this article will lead you to discover new aspects about Ascent MKE and will surely leave you with a new vision on this topic.
Ascent MKE | |
---|---|
![]() Ascent, the world's tallest mass timber hybrid building, after completion in 2022. | |
![]() | |
General information | |
Status | Completed |
Type | Residential |
Location | 700 E. Kilbourn Ave. Milwaukee, Wisconsin ![]() |
Construction started | 2020 |
Opening | 2022 |
Technical details | |
Floor count | 25 |
Design and construction | |
Architect(s) | Korb + Associates |
Developer | New Land Enterprises/ Wiechmann Enterprises |
Other information | |
Public transit access | ![]() ![]() |
Website | |
ascentmke |
Ascent MKE is a mass timber hybrid high-rise apartment building in Milwaukee, Wisconsin.[1] The 284-foot (87 meter),[2] 25-story high-rise is the world's tallest mass timber structure, edging out Norway's Mjøstårnet.[3][4] It features 259 luxury apartments, retail space, an elevated pool with operable window walls, and a sky-deck.[5][6]
In May 2019, Ascent was named a recipient of a U.S. Department of Agriculture grant awarded through the Forest Service's Wood Innovations Grant program.[7] The federal grant assisted with the testing needed to prove mass timber's ability to perform as well as traditional building materials like concrete and steel to meet U.S. building codes.[8]
Plans for the project were unveiled in 2018.[9] While the initial design included 21 floors,[10][11] updates and subsequent approvals brought the total to 25 floors in March 2020.[12][13]
The project has been presented at the 2018 international CTBUH conference in Dubai,[14] the 2019 international CTBUH conference in Chicago, the 2019 International Mass Timber conference in Portland.[15]
Construction on Ascent began in August 2020, and the building was completed in August 2022.[1]